Importance of Effective Project Management with BIM

Apr 15, 2024

Category:  BIM / Digitization / Automation

Admin

Importance of Effective Project Management with BIM

Building Information Modeling, or BIM, has revolutionized the AEC industry. With 3D models and a centralized database, BIM project management fosters seamless collaboration and information sharing. It enhances project timings, budgets, and quality standards.

BIM unlocks a whole new level of efficiency and control for project managers. Read on as we explore how a career in BIM project management supercharges project management at every stage of a build.

What is BIM Project Management?

BIM project management utilizes 3D modeling for efficient planning, coordination, and delivery. Teams collaborate seamlessly in a unified environment, avoiding outdated drawings and making data-driven decisions in real-time

BIM project management enables real-time coordination, clash detection, and problem-solving. This prevents costly mistakes and keeps the project on track.

Why BIM for Project Managers?

BIM project management brings accuracy, speed, and transparency to project management. Here are some of the top benefits:

  • Collaboration and Coordination

BIM management ensures a single source of truth, reducing miscommunication in construction projects. With 3D design visualization, stakeholders can easily identify and resolve issues early on, minimizing mistakes and delays.

  • Planning and Scheduling

BIM management improves project planning by simulating construction sequences and schedules. Connected data ensures automatic updates, providing teams with an accurate picture of schedule impacts.

  • Cost Estimation

BIM project management streamlines cost estimates by quantifying materials from 3D models, minimizing errors and budget overruns.

  • Progress monitoring

BIM revolutionizes construction monitoring, integrating real-time tracking of schedule and 3D model data for optimized operations.

BIM Management Implementation Guide

A structured BIM management program is crucial for success, with clear goals and milestones tied to business objectives. Here’s a concise overview:

Prep Phase: Set goals, analyze workflows, address technology gaps, and plan training.

Pilot Phase: Test workflows with a small project, ensuring processes are efficient.

Implementation Phase:

          Mandate BIM for new projects

          Transition existing projects

          Enable asset management

Optimization Phase: Expand BIM across units, improve maturity, and track ROI.

Review progress regularly against benchmarks, refining the roadmap as needed. Upskilling staff and utilizing change champions are vital for the adoption and maximizing benefits.

BIM skills development: Now & in the Future

Transitioning to BIM requires reskilling for evolving roles. Project managers must become BIM managers, focusing on technology, process re-engineering, stakeholder engagement, data analytics, and change management. Upskilling current talent is key, with fresh graduates also contributing to adoption. Many universities offer relevant AEC courses aligning with industry demands.

Conclusion

In summary, effective project management with BIM is essential in modern construction. Its collaborative, visual, and data-driven features streamline processes, mitigate risks, optimize resources, and ensure timely, budget-friendly project delivery. Embracing BIM is about a new project management paradigm fostering efficiency, innovation, and success in construction.


About TechnoStruct Academy:

TechnoStruct Academy is the educational arm of TechnoStruct, LLC, a registered design engineering firm based in California. It offers specialized BIM training programs for architecture, MEP, and BIM Management.

Our BIM Certification Courses:

BIM-Ready+: Become a BIM Management professional specialized in managing all ASMEPF projects working with open BIM and interoperability with a credible BIM Manager Certification.

BIM-Ready Complete: Become a BIM Engineer specialized in all ASMEPF (Architectural, Structural, Mechanical, Electrical, Plumbing, and Fire Protection) disciplines working with open BIM and interoperability.

BIM-Ready (Arch+Structure): Specialize in BIM Fundamentals, Conceptual Design, Sustainable Design, Design Development, and Construction Documentation in the BIM Environment with this BIM Architect Course.

BIM-Ready (MEP): Become an MEP BIM Engineer specializing in BIM Fundamentals, HVAC, Electrical, Plumbing and Fire Fighting, Design, and Modeling in a BIM Environment.

Bexel Manager Certification Program: This program teaches you about BEXEL Manager, a software that brings together key 3D, 4D, 5D, and BIM features, making it quick and easy to embrace BIM processes and technology for speedy project implementation.

FAQs

What are the typical cost savings from using BIM?

BIM project management minimizes costly rework through enhanced design coordination. Most studies show around 15-25% reduced project costs from faster delivery, less waste, and avoiding overruns. Some estimate even higher savings of upwards of 30-50%

How can BIM help manage changes during construction?

BIM management centralizes a coordinated information model. So, any changes can be rapidly updated across all disciplines. Teams instantly see design impacts, check for clashes, and reschedule dependent activities. This reduces delays from change orders.

Is it realistic to convert ongoing projects to BIM?

While possible, it takes strategic planning and alignment from all parties to transition existing projects to BIM. Legacy systems and mindsets pose adoption barriers. Targeting early contractor involvement and change protocols are key for a successful conversion.

 

Admin